The compact tablet press mounting press is mounted on a solid wooden table with three M12 anchor screws. The working paper from the countertop to the ground is about 600 mm. For the convenience of disassembly and repair, the position piece corresponding to the lower punching phase rod on the wooden workbench should also have a hole with a diameter of about 35 mm. Connect the motor to the ground wire before turning on the motor power to ensure safety. Then remove the V-belt, turn on the motor power, and start the motor to observe whether the motor rotates in the correct direction. The direction of rotation of the motor shaft should be opposite to the direction of the arrow on the protective cover or handwheel. Then connect the triangle and then install the V-belt.
Installation of the small tablet press die and adjustment during tableting (1) Install the upper punch: loosen the lower punching set screw, turn the handwheel to raise the lower punching rod to the zui high position, and insert the lower punch into the hole of the lower punching rod After the zui, tighten the lower fixing screws.
(2) Install the lower punch: Loosen the upper punching tightening nut, insert the upper punching rod into the hole of the upper punching rod, insert it to the end, use a wrench to clamp the hexagonal part of the upper part of the punching rod, and tighten the upper punching tightening nut.
(3) Install the middle mold: Loosen the middle mold fixing screw, put the mold in the hole of the middle mold plate, and make the lower punch into the hole of the middle mold, press the bottom and then tighten the middle mold fixing screw. When placing the mold, pay attention to flatten the middle mold to avoid jamming when the skew is placed and damage the hole wall.
(4) Turn the handwheel by hand to slowly lower the upper punch into the middle die hole to observe whether there is collision or friction. If there is collision or friction, loosen the middle die plate fixing screws (two) and adjust the middle die table. The position of the plate is fixed so that the upper punch enters the middle die hole, and then the middle die plate fixing screw is tightened, so that the upper punch enters the middle die without collision or friction for the installation.
2. Adjust the output of the film and turn the handwheel to raise the lower punch to the high position of the Zui. Observe whether the lower punch surface is flush with the plane of the middle die, then loosen the butterfly screw, loosen the gear platen and transfer the adjustment gear. Make the lower punch face flush with the plane of the middle die, then press the platen up and tighten the thumb screw. At this point, the handwheel is shaken by hand, and the empty car runs for more than ten revolutions. If the machine is running normally, the pressure can be fed and the next step can be adjusted.
3. Adjust the pressure, loosen the connecting rod lock nut, turn the upper punching rod, turn to the left to move the upper punching rod downward, then the pressure will increase, and the hardness of the pressed tablet will increase; otherwise, turn to the right and the pressure will be Reduce, the hardness of the tablet is reduced. After adjusting, use the wrench to clamp the hexagonal part of the lower part of the upper core rod, and still lock the connecting rod lock nut. At this point, the adjustment of the die is basically completed, and then the motor is tested for more than ten pieces, and the weight of the piece is checked, and the quality such as hardness and surface finish are qualified, and the production can be started. In the production process, the quality of the tablets must be checked at any time and adjusted in time.
Installation of the small tablet press die and adjustment during tableting (1) Install the upper punch: loosen the lower punching set screw, turn the handwheel to raise the lower punching rod to the zui high position, and insert the lower punch into the hole of the lower punching rod After the zui, tighten the lower fixing screws.
(2) Install the lower punch: Loosen the upper punching tightening nut, insert the upper punching rod into the hole of the upper punching rod, insert it to the end, use a wrench to clamp the hexagonal part of the upper part of the punching rod, and tighten the upper punching tightening nut.
(3) Install the middle mold: Loosen the middle mold fixing screw, put the mold in the hole of the middle mold plate, and make the lower punch into the hole of the middle mold, press the bottom and then tighten the middle mold fixing screw. When placing the mold, pay attention to flatten the middle mold to avoid jamming when the skew is placed and damage the hole wall.
(4) Turn the handwheel by hand to slowly lower the upper punch into the middle die hole to observe whether there is collision or friction. If there is collision or friction, loosen the middle die plate fixing screws (two) and adjust the middle die table. The position of the plate is fixed so that the upper punch enters the middle die hole, and then the middle die plate fixing screw is tightened, so that the upper punch enters the middle die without collision or friction for the installation.
2. Adjust the output of the film and turn the handwheel to raise the lower punch to the high position of the Zui. Observe whether the lower punch surface is flush with the plane of the middle die, then loosen the butterfly screw, loosen the gear platen and transfer the adjustment gear. Make the lower punch face flush with the plane of the middle die, then press the platen up and tighten the thumb screw. At this point, the handwheel is shaken by hand, and the empty car runs for more than ten revolutions. If the machine is running normally, the pressure can be fed and the next step can be adjusted.
3. Adjust the pressure, loosen the connecting rod lock nut, turn the upper punching rod, turn to the left to move the upper punching rod downward, then the pressure will increase, and the hardness of the pressed tablet will increase; otherwise, turn to the right and the pressure will be Reduce, the hardness of the tablet is reduced. After adjusting, use the wrench to clamp the hexagonal part of the lower part of the upper core rod, and still lock the connecting rod lock nut. At this point, the adjustment of the die is basically completed, and then the motor is tested for more than ten pieces, and the weight of the piece is checked, and the quality such as hardness and surface finish are qualified, and the production can be started. In the production process, the quality of the tablets must be checked at any time and adjusted in time.