How to manage winter spinach?

Spinach is a common green vegetable, and the demand in the market is relatively stable. Many areas have spinach plantation parks, and many families also grow spinach in their own vegetable gardens. But no matter what kind of planting method, the most important thing at the moment is to focus on scientific management to help spinach safely overwinter. So how should winter spinach be managed? Let's understand.

Overwintering spinach

1. After sowing

After sowing, the seedlings are pulled out, and it is necessary to add water appropriately. After the seedlings are fully populated, if the seedlings are too dense, it is time to plant and fix the seedlings. The seedlings were thinned for the first time when there were 2 to 3 true leaves, and the seedlings were not replaced every 7 days or so. Finally, the seedlings should be 10 cm x 10 cm away from the seedlings. Remove the diseased seedlings and yellow seedlings to ensure that the seedlings are neat and grow well. Before entering the winter, ensure that there are 4 to 6 true leaves.

Key Points of Overwintering Spinach Management

2. Before overwintering

Before overwintering, we must ensure that the soil is moist, and it is found that the soil is dry and watered in time to promote the growth of spinach. After sprouting and unearthing, loosen the soil in time. When the plant grows 3 to 4 leaves, it can properly control moisture and promote root development, which is conducive to spinach overwintering. Before frost and icy weather, it is necessary to cover the plastic film and shading net in time.

When the plant grows 4 to 5 leaves, it will soon stop growing, watering and freezing in time, the frozen water is best to use manure water, which is conducive to accelerating the growth of green plants. Control fertilizer and water during the winter.

3. After winter

After overwintering, remove snow and covered weeds in time. It is not advisable to turn back to watering too early. After the temperature rises in early spring, the soil layer is thawed, and when the spinach leaf heart starts to grow, start watering. The amount of water should not be too large to prevent lowering the ground temperature and affecting the growth of spinach. When the plant grows to 6-10 cm, water it once every 7-8 days.

Both spinach and saplings are edible and can be harvested many times at a time. It can be harvested when the height is 18~25 cm. The growing period is usually about 55 days. The spinach is sown in time, and the harvested yield is the highest. There are 5-6 leaves in 30-50 days after sowing. Once harvested, basically all harvested in about 50 days, it is not easy to harvest too late, so as not to affect the yield and quality.

Disclaimer: Some articles of this website are transferred from the Internet. If the legal rights of third parties are involved, please inform this website for processing. phone

Alternative Sandbags

The new flood control and water retaining plate is made of composite materials and weighs only 3.8kg. It is easy to use and fast to install. The water baffle uses the "L" shape principle. The erected structure is used to block rainwater, and the ground structure can convert the accumulated water into pressure, so that the water baffle will not fall.

The new type of water retaining plate is flexible and flexible. It can be used in semi closed tunnels when there is less rainwater on the road surface, allowing special vehicles such as buses to pass first. Once the rainstorm becomes a disaster, the tunnel can be completely closed quickly to avoid greater damage.

Alternative Sandbags,Super water activated sandbag,Plastic Water Dams

Denilco Environmental technology(Suzhou)Co., Ltd. , https://www.wflood.com